Featured Project

83-85 Grand Bend

3 Storey commercial/residential building in the heart of Grand Bend. The ground floor is complete with a restaurant accessible to the public and 7 dwelling units on the second and third floor with a private roof top patio for the use of the residents. Mechanical systems used are traditional rooftop units and traditional gas water heaters.

Location: Grand Bend, ON
Completion Date: Spring 2019
Featured Project

1218 Riverside Apartment

This modern 4 storey, 5 unit residential along the Thames River has underground parking, in unit Laundry, and an elevator in the main lobby for all residents. Integrated Engineering provided the electrical and mechanical engineering for this new building. Providing modern slim linear slot diffusers, in-floor heating, and a HRV (heat recovery ventilation) system. A new incoming services was provided in coordination with London Hydro.

Location: London, ON
Featured Project

North Point Loft Condominiums

4-Storey, 43-Unit Apartment Building. Suites have individual HVAC systems and laundry facilities.

Location: London, ON
Featured Project

Oxford Gardens

Four storey 82 unit, 17,000 sq. ft. per floor addition to existing retirement building. Included complete mechanical and electrical design of the new addition with renovations to the existing building, replacement of existing back-up generator, new back-up generator for the the addition, upgraded site lighting, and an innovative mechanical design to utilize roof solar system in the heating and cooling of the building.

Location: Woodstock, ON

More Projects

  • Whitney Apartment Building

    Conversion of an existing public school into a 2-storey, 25 unit apartment building. Providing all new mechanical systems for the entire building and new electrical for each individual unit.

    Location: Porcupine, ON
  • First Sarnia Place

    Conversion of an existing 14-storey office building into Luxury Condominiums. Existing mechanical and electrical systems, including a central heating plant and chilled water system were maintained and modified to suit the new use.

    Location: Sarnia, ON